Trinitas shipped in April 118 mantel pieces from manufacturers premisses in Holland by pontoons to the loadport Moerdijk where they were loaded from the barges into the contracted vessel OTOMA for Curacao under the control of Trinitas. The 118 mantel pieces will be erected into a 200meter high exhausting funnel at Curacao petrochemical plant.